Construction is complete on the Foster Avenue Extension Project 2014 (and on Phase I of the
Rails with Trails Project).
The project includes removal of existing:
- Asphalt pavement
- Concrete sidewalk
- Concrete curb and gutter
- Drainage facilities
The project also includes providing and adjusting water meter boxes to grade, adjusting utility and manhole covers to grade, and the placement/construction of:
- Concrete sidewalk
- Curbs and gutters
- Asphalt pavement
- Pavement striping and markings
- Signage
- Storm drain piping
- Storm drain inlets
- Water and wastewater system extension
- Retaining walls
- Drainage swales