Foster Avenue Extension Project

Construction is complete on the Foster Avenue Extension Project 2014 (and on Phase I of the Rails with Trails Project).

The project includes removal of existing:
  • Asphalt pavement
  • Concrete sidewalk
  • Concrete curb and gutter
  • Drainage facilities
The project also includes providing and adjusting water meter boxes to grade, adjusting utility and manhole covers to grade, and the placement/construction of:
  • Concrete sidewalk
  • Curbs and gutters
  • Asphalt pavement
  • Pavement striping and markings
  • Signage
  • Storm drain piping
  • Storm drain inlets
  • Water and wastewater system extension
  • Retaining walls
  • Drainage swales